Baglan Power Station

Thursday, May 7th, 2015

DSCF2060DSCF2061DSCF2063DSCF2062

Being one of the most advanced power stations in the world and their commitment to Health & Safety, where safety is THE most important factor when carrying out any job or process, General Electric naturally look for and require an exceptionally high level of commitment, competence and workmanship from their contractors.

As well as providing a 24 hour call out service, our contract is to provide a full routine maintenance programme for all HVAC on site.

Pricipality Building Society – Cardiff

Wednesday, April 29th, 2015

Constant upgrading and modifying of office areas at their Queen Street head office as well as their numerous branches throughout Wales, has meant continuous air conditioning requirements.

These Daikin split systems were installed to serve various offices, training rooms, open plan areas and staff rooms within the Queen Street office block.

DSCF1120 DSCF1121

Arthur Llewellyn Jenkins

Wednesday, April 29th, 2015

The 4500m2 sales area, along with the significant amount of lighting suffered with extremely high temperatures in the summer, which became highly uncomfortable for staff and customers.

We were approached and asked to propose a scheme that would alleviate the problem.

We supplied and installed 7no Fujitsu AOY90TP 25.00kw condensing units and 14no Fujitsu AUY45TL fan coils to introduce a total of 175.0kw of cooling to the area.

DSCF0864 DSCF0869 DSCF0866

Dyfed Powys Police Headquarters

Wednesday, April 29th, 2015

Dyfed Powys’ new meeting/conference and teaching room facility in Carmarthen. A number of conference rooms needed to be conditioned to cater for anything from 10 to 100 people. The air conditioning requirements were catered for with the installation of a Daikin Heat Recovery unit which served a total of 11 ducted indoor fan coils.

The ventilation aspect of the project involved the installation of 4no Daikin VAM100 total heat exchanger units. 

All rooms and equipment were controlled and constantly monitored with a Daikin IC64 intelligent controller.

Papa Sanchos Stonegrill

Wednesday, April 29th, 2015

A new establishment recently opened in Swansea, adopting a new restaurant concept where the customer can participate in the cooking of their meal.

A number of Fujitsu AUY36L heat pump cassettes were installed to create a comfortable temperature and environment for staff and customers.

A separate 300mm extract system was designed and installed to remove all unwanted stale air and provide a clean, fresh atmosphere.

DSCF0887 DSCF0888 DSCF0892

GE – Baglan Power Station

Wednesday, April 1st, 2015

Being one of the most advanced power stations in the world and their commitment to Health & Safety, where safety is THE most important factor when carrying out any job or process, General Electric naturally look for and require an exceptionally high level of commitment, competence and workmanship from their contractors.

As well as providing a 24 hour call out service, our contract is to provide a full routine maintenance programme for all HVAC on site.

DSCF2060
DSCF2061

DSCF2063

DSCF2062